For the specialty paints, solvents, chemicals and coatings industry, declared values can be tricky to get right without specialist knowledge. Basing values for this sector on the reinstatement costs of a standard building or plant means easily missing specialist process equipment, installations, systems, and services that cost much more than you may expect.
Valuations should consider every aspect of the industry, both on-site and across the wider market. Leaving reinstatement costs to guesswork or models can leave plants underinsured and owners potentially even exposed to the average clause if overlooked.
In this article, we will cover five key cost elements of the industry, as well as an actionable checklist of steps you can take to ensure your assets are adequately insured and covered in the face of a loss.
What is the current landscape for the industry?
Businesses operating across the paints, solvents, and chemicals sector are navigating a transition driven by cost pressures and demand changes.
The most recent Chemical Industries Association’s Q3 2026 survey has highlighted increasing energy costs, alongside lower demand and difficult decisions to invest, adding to growing pressures across the sector. All of which can make historical asset figures a poor guide to the most recent replacement costs.
SImultaneously, several broader industry changes have reshaped both how these sites operate and what it costs to replace or repair them following a major loss, including:
- Supply chain friction and longer lead times, from complicated sourcing for raw materials and bespoke process equipment. When lead times are extended, reinstatement of assets takes much longer, which adds to the cost to replace.
- Petrochemicals have faced increasing demand while firms are also navigating a need to move towards renewables, such as bio-based or lower-solvent formulas. As businesses are adapting their production lines to meet this changing market and sustainability demands, risk profiles and costs are shifting to match these factors.
- Everyday compliance and identifying suitable reinstatement options after a loss relies heavily on technical specialists who can recommend appropriate actions, materials and processes. This necessity for expertise can drive up professional fees and even extend recovery timelines following an insured event, due to the scarcity of specific process engineers and consultants.
These pressures throughout the sector mean that reinstatement valuations ought to be regularly reviewed. What a chemical plant costs to rebuild, and how long it takes, depends on how the industry is operating.
Amongst these shifts, the cost to replace assets within the sector will have most certainly fluctuated – making the need for an up-to-date Reinstatement Cost Assessment (RCA) even more crucial.
Here are the five key reinstatement cost components that this industry should not ignore or misjudge.
1. Specialist process plant items
Unlike standard factory machinery, process equipment on chemical and coating sites is often bespoke, ATEX rated and tied directly into continuous production lines. High-shear mixers, specialist coatings-lined vessels, reactors, fume extraction systems, and process controls all carry substantial unit costs, often leading to longer lead times than expected.
Complex pipework systems are also commonly under estimated when firms approximate reinstatement costs internally. Extensive runs, specialist alloys or linings, changing regulations and installations across multiple systems make pipework expensive to engineer and install. When valuations focus only on machines and overlook services such as pipework runs, controls, or extraction, declared values can fall short before reinstatement even begins.
2. Complex site utilities
A chemical or paint facility depends on unique, specialist services to keep processes stable and safe. Chilled water, industrial gas systems, thermal oil, steam, and water or wastewater treatment systems add major capital and installation cost compared with basic light-industrial utilities.
Because these services support multiple process areas at once, reinstating or replacing them after a loss is rarely straightforward. If a valuation treats site utilities as minor background infrastructure rather than high-value engineering assets, or misses how upgrades affect connected assets, the true cost of getting the site back to full capacity can be very easily understated.
3. Hazardous areas
Plants for this industry often need explosion-proof or hazardous zones to handle their sensitive materials, flammables, and reactive substances. Equipment rated for these areas, and specialist electrical and mechanical installations, cost noticeably more to source, install, and certify than standard industrial sites.
Building features and site protection add further layers of specialist cost, often including:
- Explosion relief panels, segregated process or storage areas, and fire-rated barriers built around hazardous operations.
- Sprinkler, deluge, or foam systems for fire protection, or suppression capacities designed for chemical and solvent risks.
- Extraction, scrubbing, or abatement systems for specific odour control measures – often a requirement when sites operate near residential properties or strict local limits.
4. Demolition and debris management
When a major incident damages a chemical or coatings site (such as a fire, flood, spill, or leak) clearing the debris is rarely a standard demolition activity as many additional safety measures must be considered. The hazardous materials, chemical residues, and contamination risks require specialist contractors, and licensed hazardous-waste disposal – driving up overall demolition and debris removal costs.
5. Specialist expertise
Complex process sites and plants require specialist input at every stage, ensuring that every process and material is handled with appropriate care and measures. Process engineers and safety or compliance consultants, to project managers, environmental specialists, and valuation surveyors are at the core of this specialism. This technical complexity leads to higher professional fees than on typical industrial or warehouse sites.
Across the sector, this strong demand for specialist expertise can compound the issue. For such a niche, technical industry, these scarce technical skills can lengthen project schedules and increase advisory and engineering costs during reinstatement. This makes realistic professional fee allowances and independent, inspection-led valuations essential to keeping recovery on track. However, this professionalism can cost much more than expected or estimated – creating the final hidden cost area associated with this sector.
Reinstatement costs can also increase due to stricter building codes and regulatory standards. Rebuilding often means meeting updated safety, environmental, or structural rules rather than simply replacing assets like-for-like. If policy allowances or reinstatement estimates do not reflect current regulatory expectations and hazardous clearance requirements, those costs can cause further issues down the line.
Next steps: key insurance and valuation checklist
For professionals within the paints, solvents, and chemicals sector navigating the reality of these hidden costs ahead of their next RCA, here is a handy checklist to help you review whether your declared values truly reflect their reinstatement value:
1. Audit process plant, controls, and pipework
Confirm that your site’s specialist equipment – from the high-shear mixers to complex pipework systems are accurately valued at current replacement costs rather than historical figures.
2. Thoroughly review site utilities
Check that all systems are properly assessed to reflect their full, current installation requirements. Ensure there is no overlap, or gap, between buildings and contents.
3. Verify allowances for hazardous areas, fires, and odours
Ensure that all explosion-proof electrical and mechanical installations, segregated areas, firefighting systems, and odour-control equipment are properly accounted for in the RCA.
4. Check that all hazardous demolition management processes are covered
Review your reinstatement estimates for appropriate and safe hazardous material clearance, specialist contractors, and strict regulatory requirements.
5. Assess professional fees
Ensure that all professional fee allowances reflect your plant’s specific complexities and specialist demand. You should also check that Business Interruption indemnity periods align with realistic lead times on bespoke equipment and supply chains.
6. Review your current reinstatement valuation policy
Especially if your site has seen any changes to renewable inputs, modified production lines, supply chain shifts, or even changed its layout or been renovated, these substantial changes to your plant and business need to be considered in your declared values. This can affect both cover and premiums.
The Royal Institution of Chartered Surveyors (RICS) recommends that a full review of your declared values should take place every three years. However, if your site and/or assets have seen substantial changes since your last RCA, it is recommended that a new RCA is taken, even if it has been less than three years.
7. Consult your broker or insurer early
The complex landscape of the paints, solvents, and chemicals sector requires conversations with your financial and insurance advisors. It’s important to discuss any operational or financial changes before renewal. This will prevent any surprises or flags in the case of a claim.
The completeness of the population is often as important as unit cost. Contents may extend from major equipment to furniture, IT hardware, tools and low-value items in aggregate, but definitions, sub-limits and exclusions vary.
Stock, vehicles, money, software/data, tenants’ property and third-party assets may be treated separately, so report categories should reconcile directly with the policy definitions and schedule.
Time to review your declared values and stay protected
In the paints, solvents, and chemicals sector, underinsurance rarely comes from a single error. More often, it builds up quietly across these complex processes and materials, expensive systems, and longer lead times – leaving a business exposed to inadequate insurance cover and the average clause when faced with a loss.
At Charterfields, we specialise in independent, professional RCAs for complex industrial and process sites. If you would like to review your current declared values or discuss upcoming site changes or renewals, get in touch with our team for a no-obligation conversation.
